This research addressed the issue of  the PT. XYZ production line  balancing which produces powder and ceramic. The completion time of the production line is important because there are  differences in the capacity of the machines, especially on powder machine and press machines. This approach is done by using the  Helgeson and Birnie method by considering the activities processing time  on the production floor. This method increase Balance Delay of powder process at point 0.3333 and Balance Delay of ceramics process in Press A1 and A2 in the Press is 0.1968 and 0.2185. The level of powder process efficiency is 65.82%, while level of powder process efficiency is in Press A1 is 80.31%. The level of efficiency in the production of ceramics in Press A1 is 74.07%

References

Bedworth, D. Integrated Production Control System. New York: John Willey and Sons Inc. 1982.
Breginski,RB, MG Clato and JL Sass Jr, Assembly Line Balancing Using Eight Heuristic, 22nd Internasional Confrence on Production Research, Iguazu Falls, Brazil 2013
Vincent Gaspersz, Dr, D.Sc., CFPIM, CIQA,1998. Production Plan ning And Inventory Control: Berdasarkan Pendekatan Sistem Teritegrasi MRP II dan JIT Menuju Manufacturing 21, Penerbit Gramedia Pustaka Utama, Jakarta.
Dyah, Saptanti., 2008 ”Perbandingan Metode Ranked Positional Weight dan Kilbridge Wester Pada Permasalahan Keseim bangan Lini Lintasan Produksi Berbasis Single Model”. Bandung: ITB.
Sumanth, D.J., 1985 Productivity Engineering dan Management,Mc Graww-Hill, Inc, USA
Tam, Paul Wim Ming, 1999, The use of enhanced positional weight method for constrained resources project scheduling, Canadian Journal of Civil Engineering, 26.2, 42-247
Sritomo,2008, Ergonomi Studi Gerak dan Waktu. Surabaya: Guna Widya. 2008.

Downloads

Published

01-08-2014

How to Cite

Sinaga, T. S. (2014). PENGUKURAN KESEIMBANGAN LINTASAN PRODUKSI KERAMIK DENGAN METODE HELGESON DAN BIRNIE DI PT.XYZ. JURNAL TEKNOLOGI TECHNOSCIENTIA, 7(1), 070–075. https://doi.org/10.34151/technoscientia.v7i1.611