ANALYSIS OF REWETTING TIME AND TEMPERATURE DISTRIBUTIONS DURING COOLING PROCESS IN VERTICAL RECTANGULAR NARROW CHANNEL
DOI:
https://doi.org/10.34151/technoscientia.v6i1.586Keywords:
cooling process, rewetting time, temperature distributionAbstract
Cooling process to analyze effect of gap size to rewetting time and temperature distributions were studied from transient temperature of surface plate. It as result of experiment using two vertical plate with the initial temperature about 600°C. Debit and temperature of cooling water are 0,09 L/s and saturated temperature. The gap sizes were changed from 1 mm, 2 mm, and 3 mm. As the results showed that the smaller the gap size, the longer the rewetting time. Pattern of temperature distribution is similar at initial condition for all of gap sizes and the smaller the gap sizes, the longer the time of decreasing temperature.
References
Riyono, B., Indarto, Juarsa, M., Sinta, T.H., Kiswanta., Ainur., Edy., Joko., Ismu H., 2010, Experimental Analisys of Heat Flux in Annulus Narrow Channel Based on Variations of Cooling Water Temperature Using Uji HeaTING-01, Gadjah Mada University.
Zhang, J., Tanaka, F., Juarsa, M., Mishima, K., 2003, Calculation of Boiling Cuves during Rewetting of a Hot Vertical Narrow Channel, The 10th International Topical Meeting on Nuclear Reactor Thermal Hydraulics.