PENERAPAN METODE CRITICAL CHAIN PROJECT MANAGEMENT UNTUK PERENCANAAN PROYEK VERY LOW PRESSURE PHASE-II KEI Ltd

Authors

  • Siti Rohana Nasution Jurusan Teknik Industri, Universitas Pancasila Jakarta
  • Resthy - Jurusan Teknik Industri, Universitas Pancasila Jakarta

DOI:

https://doi.org/10.34151/technoscientia.v6i2.573

Keywords:

Critical Chain Project Management, Project Buffer, Buffer Time, Feeding Buffer

Abstract

This research is do to make Very Low Pressure Phase-II Project which be expected to not like the last project which have not appropriate between plan and implementation. It is because the increase of activity which is not planned before and student’s syndrome behavior. Student’s syndrome like spin out time is occur because the safety time in every activity and when a project have a problem, with the result that the estimation time and cost is bigger. Therefore, it be made a plan with applied Critical Chain Project Management method. From primer data and secondary data be treated with microsoft project software. This method is to hide safety time in every activity and change with buffer time. Increase buffer time with using cut and paste method is add project buffer half of critical chain duration at the end of chain and put feeding buffer with half activity to activity at not critical chain which bring it to critical chain. The result of research is when a project is already start and no changes,  so the project can finish during 370 day with cost 3,558,232.73 USD. When the project is not appropriate, then buffer time can be consumed about  185 day with resource buffer cost about 334,767.27 USD and total of finished project is 555 day, a safety time for Very Low Pressure Phase-II project.

References

Budi Santosa, 2009 Manajemen Proyek Konsep dan Implementasi, Edisi Pertama, Graha Ilmu, Yogyakarta
Goldratt, Eliyahu M. 1997 Critical Chain Method, North River Press, Great Barrington, MA.
Ilham Hariadi 2013Analisis Penjadwalan Proyek Apartemen Tamansari Panoramic Bandung Dengan Menggunakan Metode Critical Chain Project Management Skripsi Jurusan Teknik Sipil Fakultas Teknik Universitas Brawijaya Malang
Iman Soeharto, Manajemen Proyek dari Konseptual sampai Operasional, Edisi Kedua, Erlangga, Jakarta, 2001
Rizky Nurannisa Heryati 2012 Analisis Penerapan Critical Chain Project Management Pada Proyek Pembangunan Rusunawa Kediri Skripsi Universitas Gajag Mada
_____ A Guide to the Project Management Body of Knowledge (PMBOK@ Guide),5th edn, Project Management Institute, 2013
_____ Microsoft Project 2007 untuk Pemula, Edisi Pertama, Andi dan Madcoms, Yogyakarta, 2008
_____ Pengelolaan Proyek dengan Micro-soft Project 2003, Edisi Pertama, Salemba Infotek, Jakarta,2005

Downloads

Published

01-02-2014

How to Cite

Nasution, S. R., & -, R. (2014). PENERAPAN METODE CRITICAL CHAIN PROJECT MANAGEMENT UNTUK PERENCANAAN PROYEK VERY LOW PRESSURE PHASE-II KEI Ltd. JURNAL TEKNOLOGI TECHNOSCIENTIA, 6(2), 211–221. https://doi.org/10.34151/technoscientia.v6i2.573