PENJADWALAN PRODUKSI PADA SISTEM MANUFAKTUR REPETITIVE MAKE TO ORDER FLOW SHOP MELALUI PENDEKATAN THEORY OF CONSTRAINTS

Authors

  • Imam Sodikin Jurusan Teknik Industri, IST AKPRIND Yogyakarta
  • Aang Mashuri Jurusan Teknik Industri, IST AKPRIND Yogyakarta

DOI:

https://doi.org/10.34151/technoscientia.v4i2.510

Keywords:

Theory Of Constraints, Make To Order, Production Scheduling

Abstract

            PT. Jaya Pulau Bintan, Bangka is a company that produces rubber in the form of semi-finished materials. Companies experiencing difficulties in meeting consumer demand is continuous, because the rubber product manufacturing process is very complicated and time consuming. The research method used in addressing the problems the company is the method of scheduling a flow shop with the approach of theory of constraint in repetitive manufacturing systems make to order. The result of data processing by using 2 production scheduling system, namely FCFS scheduling with makespan yield of 18.96 days. While the TOC scheduling with makespan obtained by 16.02 days in order to obtain savings of 2.94 days. Scheduling production with the TOC proposed because it has a greater throughput and successfully utilize the resources constraints, especially at work stations more effectively and efficiently.

References

Arya, H, S., 2004, Optimasi Common Due Date pada Kasus General Flow Shop Single Machine Sequences Independent Setup Time dengan Algoritma Genetik, Skripsi, Universitas Islam Indonesia, Yogyakarta.
Aswita, E, S., 2003, Penjadwalan Produksi Flow Shop Untuk Mengoptimalkan Lead Time Manufaktuir Pada Lingkungan Manufaktur Repetitive Make To Order, Skripsi, Universitas Islam Indonesia, Yogyakarta.
Charthy, M, 1993, Addressing the Gap in Schedulling Researche: a review od Optimation Heuristic Methods in Production Schedulling, International Journal of Production Research, Vol. 31 hal 59-79.
Fogarty, Donald W., Hoffman R. Thomas, Stonebraker Peter W, Production And Operation Management, Cin-cinnati South Westrn Publishing Co, 1998.
Goldratt, E, M., 1997, The Goal: A Pro-cess of Ongoing Improvement.
Halim, A, H,. et al., 1993, Batch Sche-duling, for Production System Un-der Just In Time Environtment.
Suryati, E, 2000, Penentuan Aturan Dis-patching Terbaik Pada Proses Produksi Penjadwalan Job Shop "Side Wall" dengan Pendekatan Algoritma Genetik Skripsi, Univer-sitas Islam Indonesia, Yogyakarta.
Toha, I, S., Taroepratjeka, H, 1997, Opti-masi Penentuan Waktu Manufak-tur Produk pada Sistem Manufak-tur Make to Order Job Shop, Jur-nal Teknik Management Industri, Vol. 17 (2).
Umble, M, M., Srikanth, M, L., 1996, Synchronous Manufacturing: Principles of World Class Excellen, The Spectrum Publishing Company Inc,.
Zijm, W, H, M., 1997, Capacity Planning, Lead Time Managemen, and Shop Floor Scheduling.