PENGUKURAN WAKTU STANDARD OPERATING PROCEDURE DALAM MENINGKATKAN PRODUKTIVITAS KARYAWAN DENGAN ANALISIS SIMULASI DAN CRITICAL PATH METHOD

Authors

  • Petrus Wisnubroto Jurusan Teknik Industri,IST AKPRIND Yogyakarta
  • Muhammad Abdur Rosyid Jurusan Teknik Industri,IST AKPRIND Yogyakarta

DOI:

https://doi.org/10.34151/technoscientia.v1i1.388

Keywords:

Employee’s Productivity, SOP, Simulation, CPM

Abstract

A rich organization never warrants its member to get wealthy. It will depend on human resources empowering including floor labors that has strategic position in achie-ving organizations goal. Fluctuations of employee’s productivity performance will hardly controllable if the organization had no standardization of work. One kind of standardiza-tion of work is Standard Operating Procedure (SOP) that contains technical procedure of activity and it parametric measurement. To analyze trend of employee’s performance ti-me, computer simulation will assist to know the tendency of data that so called with com-puter simulation analysis. The result of analysis will be followed by productivity improve-ment method such as Critical Path Method (CPM). Inexistence of SOP in Balai Yasa PT. Kereta Api Yogyakarta (BY YK) will be followed up by making Standardization of work in the term of SOP using work time standard measurement consideration. By using simu-lation analysis approach that resulting very good performance of employee in BY YK. This advantageous indicator gives information ability of production improvement. By u-sing Standardization of work time and implementation of CPM able to reduce 21% of total time in assembling locomotive or approximately 158 minutes. The combination of both method results critical path of locomotive assembly activity starting from activity A, B, C, D, E, F, G, H ,I ,J ,K , L, M , N, O, P, Q, R,S, T, U,V, X, Y.

References

Averill, M. Law and W. David Kelton, 2000, Simulation and Analysis, Mc. Graw Hill,Singapore
Environmental Protection Agency, 2007, Guidance for Preparing Standard Operating Procedure (SOP), Washington DC

Johanes, Suprapto, 2006, Riset Operasi untuk Pengambilan Keputusan, Penerbit Universitas Indonesia, Jakarta
Kelton, W. David, Randall P. Sadowski, David T Sturrock, 2004, 3rd ed, Simulation With Arena, Mc Graw Hill, New York
Muchdarsyah, Sinungan, 2003, Produktivitas Apa dan Bagaimana, Bumi Aksara, Jakarta
Sondang, P. Siagian, 2002, Kiat Meningkatkan Produktivitas Kerja, Rineka Cipta, Jakarta
Sritomo, Wignosoebrorto, 2003, Ergonomi Studi Gerak dan Waktu, Guna Widya, Surabaya
Thomas, J. Kakiay, 2004, Pengantar Sistem Simulasi, Penerbit Andi, Yogyakarta.

Downloads

Published

01-02-2008

How to Cite

Wisnubroto, P., & Rosyid, M. A. (2008). PENGUKURAN WAKTU STANDARD OPERATING PROCEDURE DALAM MENINGKATKAN PRODUKTIVITAS KARYAWAN DENGAN ANALISIS SIMULASI DAN CRITICAL PATH METHOD. JURNAL TEKNOLOGI TECHNOSCIENTIA, 1(1), 131–140. https://doi.org/10.34151/technoscientia.v1i1.388