PENJADWALAN BATCH PADA SISTEM PRODUKSI JOB SHOP SINGLE ITEM MULTI

Authors

  • Endang Widuri Asih

DOI:

https://doi.org/10.34151/technoscientia.v0i0.1884

Keywords:

Batch scheduling, Job Shop, makespan

Abstract

Peripatetic company in area manufacture will not get out of the that company ability to run its operation. Environmental problems optimation of manufacture usually hit the finite resource allocation of its amount in a few work area. With the certain criterion performance, the problems optimation is usually finished. One of form optimalitation in system manufacture is by scheduling existing production facility to finish some job. Two general criterion which often weared to evaluate the performance scheduling is makespan and flow time. At this research is conducted to compare the minimum makespan is by using overlapping method and without using overlapping method. Overlapping method is division of a number of part to be produced by multi stage into some batch in such a way that the batch can be parallelly processed.             Batch scheduling by using overlapping method represent the optimal solution by minimation makespan. Total the optimal batch as much 2. Makespan got is equal to 148745,08 minute, smaller than makespan got without using overlapping method that is equal to 152000 minute. Big of time thrift is equal to 2,14%.

References

Baker, K.R., 1974, Introduction To Sequencing And Scheduling, John wiley & Sons, Inc., New York.
Bedworth, D.D. and James E. Bailey, 1987, Integrated Production Control System : Management, Analysis, design, 2E, John wiley & Sons, Canada.
Blackstone Hoffman, Fogarty, 1991, Production & Inventory Manage-ment : Second Edition, South. Western Publishing Co, Cincin-nati
Buffa E.S, 1996, Management Operasi Dan Produksi Modern, Binarupa Aksara, Jakarta.
Conway, R. W., Maxwell, W.L., and Miller, L. W., 1967, Theory Of Scheduling” Reading, Massa-chusetts, Adison Wesley, Publishing Company.
Gasperz, Vincent, 1998, Production Planning and Inventory Control. Pt. Gramedia Pustaka Utama, Jakarta.

Downloads

Published

01-10-2004

How to Cite

Asih, E. W. (2004). PENJADWALAN BATCH PADA SISTEM PRODUKSI JOB SHOP SINGLE ITEM MULTI. JURNAL TEKNOLOGI TECHNOSCIENTIA, 17–26. https://doi.org/10.34151/technoscientia.v0i0.1884